| June 17, 2003 |
![]() The old gymnasium, housing the kitchen furniture for now. Notice that the piping along the kitchen side has been taken down. |
![]() The kitchen area is being remodeled. The large opening in the wall will be the site of the large freezer. |
![]() The pantry wall is gone as work proceeds in the kitchen. |
![]() Looking from the old lunchroom: the door that faced the coat rack has been removed, and a new door has been installed (in the area where the school altar stood in the hallway). This room will become a conference/work room. |
The school kitchen with all furniture removed. |
This portion of the old gym will serve as the dishwasher line. The old hallway to the kitchen will be closed off, and the dishwasher equipment will be installed there. Trays will be returned through this new window. |
A look at where the new entrance to the old lunchroom is located. The hallway at the left will be closed off for the new dishwasher area. |
The 5th grade modular classroom has been removed. The 1st//2nd grade modular will soon follow. |
The area outside the kitchen area. The freezer will be moved to the site with the wood over the wall. |
The door to the old offices. Notice that the wall dividing the work room and office has been removed. |
The secretary's office, looking into the old principal's office. |
Inside the old principal's office. |
Standing in the old secretary's office, looking at the old workroom. There used to be a wall dividing these areas. |
Looking at the old women's restroom area. New piping and other extensive remodeling is being completed in these washrooms. |
The old resource room. When first designed, this room was the girls' shower room. Note the drain. |
The old resource room. As in all rooms in this hallway, the heater grates have been removed. |
The upper grades hallway facing west. |
The old 6th grade room will become the before- and after-school care center. |
The upper grades hallway facing east (towards the lunchroom and kitchen). |
Looking at the old gymnasium area. |
| Click here to return to the top of the page |
| July 1, 2003 |
Painting the former lunchroom. |
Installing the heating/AC system in the new dishwasher area. |
The former school office |
The brothers Zelt prepare the hallways for painting. Thanks, guys. |
The 7th grade room is now finished, thanks to Mr. Dicke and his sister. This area had been the site of the heating register and pipes. |
Sealing up the kitchen area where the new freezer will be. |
The walls are in the process of being painted, the new floor is in place, and the cabinetry is being refinished. |
| July 20, 2003 |
![]() This is the new dishwasher area. The wall straight ahead was added to enclose the area. This used to be the kitchen entrance looking toward the upper grade classrooms. The hole in the wall on the north (right) was cut out from the former gym (now "cafetorium"), where students can return their lunch trays. |
![]() Cabinet refinishing is taking place in the lunchroom area. The former pantry (behind the back wall) is now a storage area. |
![]() A sink has been installed along the wall, and the cutout awaits the new freezer. |
![]() This used to be the east end of the old lunchroom. It has now been enclosed to serve as the pantry. |
![]() |
![]() Looking into the old lunchroom door. This area will serve as a dropoff area for the child care program before and after school, and during the day will serve many purposes. You used to be able to see into the kitchen, but the new wall on the left was built to conceal the dishwasher area. |
![]() The "cafetorium" entrance, and the wall in front of the new dishwasher area. |
![]() New sinks in the boys' bathroom. |
![]() Looking east down the upper grades hallway. |
![]() Shelving construction in the new classroom is underway. |
| July 27 & 28, 2003 |
![]() Mrs. Schwantz' new classroom? Hardly. Both Mr. Dicke and Mrs. Schwantz' classroom materials are moved into the upper grades hallway while new tiling and floor waxing is taking place. |
![]() Here is the new look in Mrs. Schwantz' room, featuring new white tiling. |
![]() New dividers and toilets have been placed in the upper grades bathrooms. |
![]() Meanwhile, most of Mr. Dicke's supplies and furnishings can be found in the old resource room. |
![]() Mr. Dicke's 7th grade classroom. |
![]() The interior of the new child care room. |
![]() These wooden boxes over the upper grade lockers conceal their heating system. They are designed to be easily opened when repairs or replacements are needed. Once painted white, it will probably also contain around 1,000 fingerprints from those growing upper grade boys! |
![]() The east side of the building shows signs of new asphalt. |
![]() A new bricked area along the kitchen wall. This area will house the new freezer. |
![]() A new door on the former athletics ball room. This area will house items needed for stage productions. |
![]() Paving has begun in the new parking area on the west side of school. |
![]() A complete repainting in the old gym/new "cafetorium" has begun. This room will feature a paint style similar to the new gymnasium, having a slender red and blue stripe around its perimeter. |